Niska Road Bridge Replacement




Completion Date: September 2019

Value: $2.4 million

Owner: City of Guelph














Constructed a new 40m span steel truss bridge over Speed River. The bridge replaced a single lane Bailey bridge with a 2 lane structure complete with a 5m wide multi-use path. To preserve the heritage of the existing bridge, the original abutment stones were incorporated into the new structure.




Sierra Construction Group

Address: 1401 Dundas St, Woodstock, ON N4S 7V9
Phone: +1-519-421-7413
Email:
info@sierraconstruction.ca

Follow Us:

  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

© 2021 Sierra Construction. All rights reserved. Construction companies web design by Melbourne Studios.

Subscribe for the latest News & Updates!